Exchange Under Riding Surface Pyramide 600 3-sided

Exchange Under Riding Surface Pyramide 600 3-sided
Request a quote
Dismantling of the existing riding surface and old under riding surface. Tailoring, marking boreholes, drilling, countersinking the new under riding surface, painting the edges and boreholes with Solarit. Assembly of the new under riding surface as well as reassembly of the existing riding surface, including screw material and disposal of waste material.
Item number
K00791
Weight kg
169.25

Related Products