Leading edge fastening

Leading edge fastening
Request a quote
Minimize the gap between the asphalt floor and the leading edge by securing the leading edge with asphalt screws. Mark out, drill and chamfer the leading edge, lift the system with a lifting device, drill through the asphalt, bond the asphalt anchors with 2-component asphalt mortar, lower the system again and align it with the holes, tighten the M10 x 50 countersunk screws.
Item number
K02101
Weight kg
tbc

Related Products